Jun
26

NCSU Unveils New Basketball Court Design

ncsu_courtThe NCSU Men’s Basketball Program this week unveiled a new paint job for their basketball courts in the PNC Arena as well as the Dail practice facility. The court features a two-toned stain, a large Wolfie head, and various small logos.

The design’s use of the school’s bright red color around the court boundary and a second stain tone inside the 3-point arc do an excellent job of marking the court’s important functional zones for the viewer.

Unfortunately, though, the second stain tone is not used in the free throw semicircle, and is inconsistent with the function of that zone. The zone’s function is actually consistent with the darker stained area, and thus, should be colored the same way. The current appearance may lead an official or viewer to incorrectly thinking a player is inside the 3-second zone when they are not.

Here is how the corrected court would look:

ncsu_court corrected

read more…

Jun
03

4-Story Mixed Use Planned For Hillsborough St.

hillsboro_2811Another piece of the residential component for Stanhope Village will be reviewed by the Appearance Commission on Thursday. According to the Preliminary Site Plan (pdf), developers plan to replace the former Red Barn/Swenson’s/SakuraXpress building at 2811 Hillsborough Street and replace it with a 4-story mixed use project.

The building would contain 30 apartments on three floors sitting atop a street-level retail floor, a development style in accordance to the Stanhope Village area plan. Plans also call for 21 vehicle spaces.

The Raleigh Appearance Commission will be discussing this project (more renderings will likely be shown) on Thursday, June 5, at 4:30 pm in the City Council Chambers. The meeting will also be televised and streamed by RTN.

top -->